Ф 3 x7 meters of second-hand ball mill
Ball mill operation procedures
1, check the good mechanical and electrical parts before driving, check whether the connecting bolt looseness; All lubricating points lubrication is normal, reliable transmission device is normal, protective equipment in good condition, electrical instrumentation is sensitive and good motor carbon brush contact.
2, barring a week, check equipment around the rotating part or presence of obstacles, and eliminate. Don't stand people around when it is started.
3, after check, press start button to start the motor, pay attention to the current changes. Grinding ball mill continuous starting must not exceed twice, the first and second every 5 minutes or more, if the third start, must cooperate after checking with electrician, fitter, before starting. Not with other equipment, to crisscross starting, so as to avoid tripping.
After 4, grinding ball machine normal operation, we will strictly according to the water supply, feed, add the provisions of the steel ball over load operation of ban, idle time is not more than 15 minutes, so as to avoid breaking plate.
5, should pay attention to check whether the cylinder is in the operation of the slurry, carefully observe current, voltage, feeding, water supply is normal, once every half an hour to check the motor and spindle temperature is not more than 60 ° С, handle in time when problems found.
6, in the operation should pay attention to observe whether the hollow shaft, oil ring rotation with oil, hollow shaft is normal temperature, such as fever, found that the hollow shaft near the tile burning, immediately forced cooling measures, must not stop immediately, lest cause "axis". At the same time pay attention to examine the oil amount, temperature, lubrication part regularly.
7, ball mill should be stop feeding before parking, standby in concentration after the treatment, stop water supply. Stop button, pull the switch.
規(guī)格型號
筒體轉(zhuǎn)速(r/min)
裝球量(t)
進(jìn)料粒度(mm)
出料粒度(mm)
產(chǎn)量
電機(jī)功率(kw)
重量(t)
(t/h)
Ф900×1800
36~38
1.5
≤20
0.075-0.89
0.65-2
18.5
4.6
Ф900×3000
36
2.7
≤20
0.075-0.89
1.1-3.5
22
5.6
Ф1200×2400
36
3
≤25
0.075-0.6
1.5-4.8
30
12
Ф1200×3000
36
3.5
≤25
0.074-0.4
1.6-5
37
12.8
Ф1200×4500
32.4
5
≤25
0.074-0.4
1.6-5.8
55
13.8
Ф1500×3000
29.7
7.5
≤25
0.074-0.4
2-5
75
15.6
Ф1500×4500
27
11
≤25
0.074-0.4
3-6
110
21
Ф1500×5700
28
12
≤25
0.074-0.4
3.5-6
130
24.7
Ф1830×3000
25.4
11
≤25
0.074-0.4
4-10
130
28
Ф1830×4500
25.4
15
≤25
0.074-0.4
4.5-12
155
32
Ф1830×6400
24.1
21
≤25
0.074-0.4
6.5-15
210
34
Ф1830×7000
24.1
23
≤25
0.074-0.4
7.5-17
245
36
Ф2100×3000
23.7
15
≤25
0.074-0.4
6.5-36
155
34
Ф2100×4500
23.7
24
≤25
0.074-0.4
8-43
245
42
Ф2100×7000
23.7
26
≤25
0.074-0.4
8-48
280
50
Ф2200×4500
21.5
27
≤25
0.074-0.4
9-45
280
48.5
Ф2200×6500
21.7
35
≤25
0.074-0.4
14-26
380
52.8
Ф2200×7000
21.7
35
≤25
0.074-0.4
15-28
380
54
Ф2200×7500
21.7
35
≤25
0.074-0.4
15-30
380
56
Ф2400×3000
21
23
≤25
0.074-0.4
7-50
245
54
Ф2400×4500
21
30
≤25
0.074-0.4
8.5-60
320
65
Ф2700×4000
20.7
40
≤25
0.074-0.4
12-80
400
94
Ф2700×4500
20.7
48
≤25
0.074-0.4
12-90
430
102
Ф3200×4500
18
65
≤25
0.074-0.4
按工藝條件定
800
137
More information about second-hand ball mill, please go to http://strawberrytiki.net at any time